Flatwork Project with HADDA Concrete

1. We Show Up Early and Walk the Project With You

Before anything starts, we do a quick walk-through:

  • confirm layout and measurements

  • check access points

  • answer last minute questions

2. Preparing the Area

We start by getting your space ready. This usually includes:

  • removing old concrete or debris

  • leveling the ground

  • adding and compacting gravel

  • setting forms for clean, straight edges

3. Pouring the Concrete

This is the part everyone loves to watch. We pour, level, and smooth the concrete so that it cures evenly and has a clean appearance. You may see a few different tools used, and that’s normal. it’s all to make sure you get a solid finish

4. Finishing Touches

Once the surface is set enough to work on, we:

  • add your chosen texture or broom finish

  • smooth edges

  • clean up the site

  • check for proper drainage

This step is where the project really comes to life.

5. How Long Before You Can Use It?

Here’s a simple guide:

  • Walking: usually 24 to 48 hours

  • Driving: 5 to 7 days

  • Full cure: around 28 days

The weather can change timing slightly, but we always keep you updated.